Data Centre Installations
JTEK UK are specialists in data infrastructure and data networks. We have implemented many data centre installations ranging from large corporate projects to smaller data centres across the UK. We provide a complete data centre installation service from project management, integration, and testing.
Whether we are working for large organisations or small businesses we provide the same level of service and attention to detail. You can view some of our recent projects here.
Our data centre installations team are fully qualified and we maintain standards in line with the latest legislation.
We work closely with electrical contractors and main contractors to push the project towards its tight time frame.
Our data centre installations team focus on meeting deadlines while maintaining high standards. If you would like more information about our data centre installation services please contact us here.
Data Cabling
A data centre installation requires a robust cabling system to ensure consistent and dependable connection to all devices. A well thought out and planned cabling system will be concealed, tidy and non-intrusive. We understand that data centres are ever growing environments so cabling infrastructures need to offer flexibility without disruption to day to day working.
JTEk UK specialising in CAT5e to CAT7A, fibre optical, AV, CCTV, Multimedia and voice cabling. Whether the project is large or small we design the optimal cabling architecture for the data centre.
Data Centre Installations
Even small data centres with a few servers require a considerable amount of cables. It is important to plan data cabling infrastructure to accommodate growth. Virtually every device in a data centre is connected to another device. To ensure a fully optimised configuration it is important that the right cable is used to perform the task. We ensure that the data cabling configuration is cost-effective without compromising on cable quality. This is achieved by properly planning the installation and by understanding the potential growth within the data centre.
For a large data centre installation, everything naturally becomes more complex. We have successfully completed some very large data centre installations such as our Sainsbury installation in London, Sutton. We met the tight deadline with no sign of running over. All elements of the data centre installation are at the highest standards, we invited the cable manufacturer to attend site so they could inspect and give us their feedback and if there was anything we could improve on. Find our more about our London Sainsbury project here.
Integrity testing for data rooms
BS ISO 14520 (2006) & BS EN 15004
It is essential to determine the likely period during which the extinguishant concentration will be maintained within the protected enclosure. This is known as the hold time. The predicted hold time shall be determined by the door fan test or a full discharge test.
The hold time shall not be less than 10minutes, unless otherwise specified by the local authority.
Predicted Hold Times: standard enclosures without continual mixing
For standard enclosures without continuous mixing the predicted hold time for the extinguishing concentration at height to fall from the initial concentration
Predicted Hold Times: enclosures of any shape with continual mixing
For enclosures of any shape with continual mixing with AC units.
Gas Extraction Systems
JTEK UK are specialists in Gas Extraction Systems. We plan and design a gas extraction system ensuring that the installation meets legislative standards. Whilst ensuring that the gas extraction system is optimised to perform at its very best while protection staff and premises we also ensure that the gas extraction system is aesthetically pleasing.
By implementing careful planning and design we keep business disruption to a minimum. This includes both the installation stage and the ongoing maintenance of the gas extraction system.
Fire Damper Installation
A Fire damper offers fire protection in heating and air conditioning ducts. The main purpose of a fire damper is to prevent the spread of fire.
Within seconds a small fire can grow into a major fire, potentially cutting off exit ways. Fire dampers will contain the fire within the room where the fire started.
JTEK UK has installed many fire dampers throughout the UK. We fully comply with the latest code of practice for ventilation and air conditioning ductwork.
Contact Us
Unit 10 The Courtyard, Holmbush Farm, Crawley Road, Horsham, West Sussex, RH12 4SE
Tel: 01293 852218
General Enquiries – info@jtekuk.com
Accounts – accounts@jtekuk.com
Our Projects
Sainsburys Project (Sutton)
J Sainsbury’s Project Description Client: J Sainsbury’sLocation: SuttonScope of Work: Data center installationMain Contractor: ESG Plc From an empty shell to a trading store within …
Woodstock IT Project
Woodstock IT Project Description Client: Woodstock ITLocation: FaygateScope of Work: Office move Our regular client was looking to move office within an old farm building, …
Asset Management Project
Asset Management Company Project Description Client: Asset Management CompanyLocation: LondonScope of Work: Data Centre Upgrade Following 6 years of making do with their UK data …
Vodafone Project (Leeds)
Vodafone Project Description Client: VodafoneLocation: LeedsScope of Work: A full pressure release system with gas extract Vodafone have been looking at upgrading their many server …